Let's place shower faucet, washbasin faucet and design cold water riser pipe.
level icon and select Isolate and then Place Work Plane.
– Route Point
.|
|
Route point name. |
CW-1 |
|
Level |
02-Floor |
|
Vertical offset. |
0 |
tool.
|
Level |
01-Floor |
|
Vertical offset. |
-500 |
|
Level |
Attic Floor |
|
Vertical offset. |
500 |
|
Route point name. |
Connect. CW |
|
Level |
02-Floor |
|
Vertical offset. |
1500 |
The next step is the placement of the faucet. To create a washbasin fauset, let's copy an object from another project.
(Ctrl+C).
(Ctrl+V).
|
Precession. |
90 |
To create a shower faucet, use the existing faucet style:
tool again. Change the parameters as below:
|
Mechanical equipment position relative to axis. |
Bottom-Center |
|
Mechanical equipment horizontal offset. |
0 |
|
Mechanical equipment vertical offset. |
0 |
|
Equipment style. |
Wall mounted bath shower mixer tap |
|
Precession. |
0 |
As well as with the sewage design, let's determine connections between plumbing fixture equipment, lay pipes, arrange required pipe fittings.
Manage styles – Pipe systems and select
Pipe system parameters option.|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
250 |
|
|
Offset |
50 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
250 |
|
|
Offset |
150 |
|
- Cold water option in the Parameters on the right.
Manage styles – Pipe systems and select
Pipe system parameters option.Our next route is going at 1500 mm height. Since we build a branch line, we don't need to change the main line parameters.
|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
250 |
|
|
Offset |
50 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
1500 |
|
|
Offset |
150 |
|
tool.|
|
Pipe accessory style. |
Ball valve 1/2" |
|
|
Pipe accessory angle. |
0 |
Manage styles – Pipe systems and select
Pipe system parameters option.|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
250 |
|
|
Offset |
50 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
170 |
|
|
Offset |
-30 |
|
Shower tray should be connected to the pipe, leading from the washbasin.
Manage styles – Pipe systems and select
Pipe system parameters option.|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
250 |
|
|
Offset |
50 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
170 |
|
|
Offset |
-70 |
|
As you can see we received warning signs on our pipes. Let's fix this.
– Other.
in the middle of the route.
Now we will put some accessories on the pipe to make cold water metering unit.
tool.|
|
Pipe accessory style. |
Ball valve 1/2" |
|
Pipe accessory angle. |
90 |
|
Mark. |
(none) |
|
Spring-loaded check valve G1/2" |
||
|
|
Pipe accessory style. |
Spring-loaded check valve G1/2" |
|
|
Pipe accessory angle. |
90 |
|
|
Mark. |
(none) |
|
Water meter G3/4" |
||
|
|
Pipe accessory style. |
Water meter G3/4" |
|
|
Pipe accessory angle. |
90 |
|
|
Mark. |
(none) |
| Spring-loaded check valve G1/2" | ||
|
|
Pipe accessory style. |
Strainer G1/2" |
|
|
Pipe accessory angle. |
0 |
|
|
Mark. |
(none) |
Considering the fact that plumbing fixture equipment was placed at the cold water design stage, we need to design the hot water riser pipe only, connect faucets to that riser pipe and place accessories.
Let's move to design.
level icon and select Isolate and then Place Work Plane.
– Route Point
.|
|
Route point name. |
HW-1 |
|
Level |
02-Floor |
|
Vertical offset. |
0 |
tool.
|
Level |
01-Floor |
|
Vertical offset. |
-500 |
|
Level |
Attic Floor |
|
Vertical offset. |
500 |
|
Route point name. |
Connect. HW |
|
Level |
02-Floor |
|
Vertical offset. |
1500 |
Let's start designing Hot Water System.
Manage styles and select
Pipe system parameters option.|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
350 |
|
|
Offset |
50 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
1500 |
|
|
Offset |
100 |
|
In the Pipe Styles tab check Pipe - PPR PN20 50x8.3, Pipe - PPR PN20 20x3.4 for Pipe styles used in the main line. For Pipe - PPR PN20 20x3.4 set 6-Polyethylene pipe covering insulation.
- Hot water option in the Parameters on the right.
Manage styles and select
Pipe system parameters option.|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
400 |
|
|
Offset |
-60 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
100 |
|
|
Offset |
150 |
|
Manage styles and select
Pipe system parameters option.|
Main line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
100 |
|
|
Offset |
100 |
|
|
Branch line |
||
|
Pipe material |
Polypropylene random copolymer |
|
|
Connection type |
Fusion welding |
|
|
Main line Route height |
500 |
|
|
Offset |
-30 |
|
tool.|
|
Pipe accessory style. |
Ball valve 1/2" |
|
Pipe accessory angle. |
180 |
|
Spring-loaded check valve G1/2" |
||
|
|
Pipe accessory style. |
Spring-loaded check valve G1/2" |
|
Pipe accessory angle. |
0 |
|
Water meter G3/4" |
||
|
|
Pipe accessory style. |
Water meter G3/4" |
|
Pipe accessory angle. |
180 |
|
Spring-loaded check valve G1/2" |
||
|
|
Pipe accessory style. |
Strainer G1/2" |
|
Pipe accessory angle. |
0 |
tool.
field.